|
|
 |
|
|
Cycle time halved with seven times fast cooling speed, productivity is
increased by 200%.
Without o-ring on the core, cooling channels are installed; Cooling channels
are installed; Cooling efficiency is maximized.
And, molding quality is superb by sucking residual air in the cavity. |
|
|
|
|
|
※ Note : Above specifications are subject to change without notice for better performance |
|
|
|
|
|
|